Initiated Requestor Completed Description Comments
24-Jun Lupita 3-Jul Install 4 parking signs west of the building
24-Jun JRH 8-Jul Boiler # 1 circulating pump isn't, motor ordered
30-Jun JRH 1-Jul CUB, Condenser pump # 3, clean out line for gauge
30-Jun JRH 1-Jul CUB, Condenser lines at chillers, clean out gauge ports
1-Jul JRH 1-Jul Fountain, vacuum
1-Jul JRH 1-Jul CUB, Connect chiller water to condenser system. (no leaks)
1-Jul JRH 1-Jul CUB, Throttle chemical feed water to eliminate pump cavitations
1-Jul JRH 1-Jul 2nd floor new entrance by handicap doors light out
1-Jul JRH 2-Jul 401, door doesn't latch
1-Jul JRH 2-Jul 462, door rubs
1-Jul JRH 1-Jul 456, east wall worn
1-Jul JRH 1-Jul 4th floor men's room door rubs
2-Jul Dave 2-Jul 419, door doesn't latch
2-Jul JRH 9-Jul 4th floor landing, 1 cf out
2-Jul JRH 3-Jul lights, south entrance,  1 wall CF, 1 Ballard
2-Jul JRH 2-Jul Fountain, check ph, add chlorine
2-Jul JRH 2-Jul Fountain, arrange lights to shine on sign
2-Jul Lou 2-Jul 252, take 12 chairs to determine maximum capacity
2-Jul Allen 2-Jul 2nd floor, west ladies, faucet running
2-Jul Laura 2-Jul OSC, store boxes and shrewder
2-Jul JRH 3-Jul swap plant on my desk for the skinny plant in the lobby
3-Jul JRH 3-Jul South entrance, remove wax from planter capstone
3-Jul JRH 3-Jul Meters, Read irrigation, main, fountain, tower
3-Jul JRH 3-Jul 418, Change out bb with no frame with one in 409
3-Jul JRH 3-Jul 414, remove dent in cove base
3-Jul JRH 3-Jul 413, door doesn't latch, lower latch opening
3-Jul JRH 3-Jul 403, remove dent in cove base
3-Jul JRH 3-Jul Plants, switch my plant with wilted one in the lobby
3-Jul JRH 3-Jul North entrance, replace 2 Ballard lamps
7-Jul JRH 7-Jan 1st floor men's secure faucet handles
7-Jul JRH 7-Jan 2nd floor men's, Ease, secure faucet handles
7-Jul JRH 7-Jan Men's faucet handles, inspect and tighten as necessary
7-Jul JRH 7-Jan Ladies faucet handles, inspect and tighten as necessary
8-Jul Lupita 9-Jul 401, door doesn't latch
8-Jul OSC 8-Jul 2nd floor ladies, west, toilet full
8-Jul JRH 8-Jul Fountain, clean filter, vacuum
8-Jul JRH 8-Jul Rock, move rock from near pond back into washout at outfall
8-Jul JRH 8-Jul 404, fill in scar in west wall
8-Jul JRH 9-Jul CUB, Add 4 gallons of TRAC 107 to hot water system.
8-Jul JRH 10-Jul Tower, sweep basin inside and out
9-Jul JRH 9-Jul Fire alarm batteries, replace 8,  all east side
9-Jul JRH 9-Jul 124, ceiling stain on south end, couldn't find anything
9-Jul JRH 11-Jul Nursing building, stake out.
9-Jul JRH 9-Jul 2 CF East 1-2 landing
9-Jul JRH 9-Jul Check west parking lot timer after 1805
9-Jul JRH 9-Jul Treat drain flies OSC, 2 E Ladies, Chartwells
10-Jul JRH 10-Jul Flag, US send off for repairs
10-Jul JRH 10-Jul 256, east door rubs at top
10-Jul JRH 10-Jul 2-3 floor landing, CF
10-Jul JRH 10-Jul 211, T-8 out
10-Jul JRH 10-Jul 220, T-8 out
10-Jul JRH 10-Jul Cove base dents, 221, 204, 259
10-Jul JRH 11-Jul Hot water heaters, drain out 5 gallons
10-Jul JRH 10-Jul 204, blinds straighten
10-Jul JRH 10-Jul 2nd floor west, secure ceiling tile
11-Jul JRH 11-Jul 201, carpet seam near back entrance, glue down
11-Jul JRH 11-Jul 265, replace bug traps
11-Jul JRH 11-Jul 265B, replace T-8
11-Jul JRH 11-Jul 201H, replace thermostat door
11-Jul Barbara 11-Jul 256, set up
14-Jul JRH 14-Jul 304, carpet seam unraveling near counter
14-Jul JRH 14-Jul cove base dents, 319, 313, 363
14-Jul JRH 14-Jul 365, door rubs
14-Jul JRH 14-Jul 366, door rubs
14-Jul JRH 14-Jul 366, install master thermostat label
14-Jul JRH 14-Jul 2-3 landing west, 1 CF out
14-Jul JRH 22-Jul Fountain, drain, clean
14-Jul JRH 18-Jul Boiler expansion tank, replace bladder
15-Jul JRH 15-Jul 461, change 2 T-8s
16-Jul Tracy 16-Jul OSC, move foes to storage
16-Jul King 16-Jul 461, add small table for Scantron grading machine
16-Jul JRH 22-Jul Fountain, clean marble 
16-Jul JRH 17-Jul MSD sheets, inventory chemicals, update list
17-Jul Alice 17-Jul class in 208 has moved to 221.
17-Jul JRH 17-Jul Water lobby plants
18-Jul Barbara 18-Jul 259, add to schedule for 7/30
18-Jul JRH 21-Jul 1st floor hall, replace light
21-Jul Laura 15-Jul move files to room 401
21-Jul Tracy 21-Jul Take 12 chairs to lobby for ACC
21-Jul Laura 21-Jul take 7 boxes to storage from 401
21-Jul JRH 21-Jul Water lobby plants
22-Jul King 24-Jul 201A, hang picture
23-Jul JRH 23-Jul Heritage area, water trees and shrubs
23-Jul JRH 23-Jul 3-4 landing, East, replace compact fluorescent
23-Jul JRH 23-Jul Hallway outside 464W, change out T-8
24-Jul JRH 24-Jul 4th floor, west porch, replace T-8
24-Jul JRH 24-Jul 462, trim carpet string, east end
24-Jul JRH 24-Jul 456, replace Sun/Moon button
24-Jul JRH 25-Jul 4th floor men's first sink drains slow
24-Jul JRH 25-Jul elevator lobby, replace compact fluoresent
24-Jul JRH 406, replace ballast, on order
24-Jul JRH 24-Jul 408, cove dented in on west wall
24-Jul JRH 25-Jul 408, match paint on touch up
24-Jul JRH 24-Jul 464S, take hand truck to storage
25-Jul David 25-Jul Elevator # 3 hydralic leak
25-Jul Dawn 25-Jul Set up table for disk jockey
25-Jul Dawn 25-Jul Clean B-B-Que Grill
25-Jul Alice 25-Jul 454, needs table
25-Jul JRH 28-Jul Irrigation, close to building, change frequency to every 3 days
25-Jul JRH 28-Jul Trash cans, ensure cans are farther than 10 feet from doors
25-Jul JRH 25-Jul Treat drain flies OSC, 2 E Ladies, Chartwells
28-Jul JRH 29-Jul Treat drain flies OSC, 2 E Ladies, Chartwells
28-Jul Laura 28-Jul Take bulletin boards from 401 to storage
28-Jul Anthony 28-Jul Hard wire cubicals in room 255A
28-Jul Anthony 29-Jul 255, Add table near entrance and remove 2-drawer file cabiinet
28-Jul JRH 28-Jul Identify transfer switches in rooms 319,362, 364
29-Jul JRH 29-Jul Heritage area, water trees and shrubs
29-Jul JRH 29-Jul Fountain, sweep
29-Jul JRH 29-Jul Stone terrace, take spalled rocks to errosion area
29-Jul JRH 29-Jul Outfall # 1, cut channel to drain ponding
29-Jul JRH 29-Jul Outfall # 3, cut channel to drain ponding
29-Jul JRH 29-Jul Tower hot deck # 1, clean drain holes
29-Jul JRH 29-Jul Tower hot deck # 2, clean drain holes
29-Jul JRH 29-Jul First floor, replace T-8
29-Jul JRH 29-Jul Irrigation, check dry areas
29-Jul JRH 29-Jul 464M, reset ice maker
29-Jul JRH 30-Jul Fountain, repair supply water leak.
30-Jul Tracy 30-Jul 252, set out table and chairs
30-Jul Anthony 30-Jul 255, move file cabinet
30-Jul JRH 30-Jul 221, test different thermostat
30-Jul JRH 30-Jul 464M, remove ice maker filter
30-Jul JRH 30-Jul Treat for gnats
31-Jul Tracy 31-Jul 252, return extra chairs to storage
31-Jul JRH 1-Aug AHU 1-1, replace outside air filters
31-Jul JRH 31-Jul Replace west side fire alarm batteries
31-Jul JRH 31-Jul Check that hot damper is closed for 112A,111E,111N
31-Jul Dawn 31-Jul 351, table outside room
31-Jul JRH 31-Jul Forth floor West. Check hot dampers on 4 VAV boxes
31-Jul Teal 31-Jul Software lab clock
31-Jul Laura 31-Jul 401, desk filer assemble