| Initiated | Requestor | Completed | Description | Comments | |||
| 2-Jun | JRH | 4-Jun | Clean acid stain at south entrance | ||||
| 2-Jun | JRH | 2-Jun | Tower, clean Lycos pre-filter, pressures low | ||||
| 2-Jun | Lupita | 9-Jun | Faculty Ice maker. After cleaning, called for service | ||||
| 2-Jun | JRH | 2-Jun | Tower, clean basins | ||||
| 2-Jun | JRH | 2-Jun | Read water meters | ||||
| 2-Jun | JRH | 2-Jun | south entrance, clean black marks from tile | ||||
| 2-Jun | JRH | 3-Jun | south entrance, clean skate board white marks | ||||
| 2-Jun | JRH | 4-Jun | Condenser water, replace leaking coupling | ||||
| 2-Jun | JRH | 4-Jun | 3rd floor east, south fire door, adjust magnetic holder plate | ||||
| 3-Jun | JRH | 3-Jun | Fountain, add chlorine | ||||
| 3-Jun | JRH | 3-Jun | Reset ceiling tiles, 3rd floor east | ||||
| 3-Jun | JRH | 3-Jun | Investigate mouse sightings at east entrance | ||||
| 3-Jun | JRH | 3-Jun | Tower pool filter leaking | ||||
| 3-Jun | JRH | 3-Jun | 4th floor men's, #2 sink fixture loose | ||||
| 3-Jun | JRH | 3-Jun | 355, replace lamp | ||||
| 3-Jun | Tracy | 4-Jun | gnats in support room, put out vinegar martini | ||||
| 3-Jun | Allen | 4-Jun | cable hiding panel under library tables- broken clips, took pics | ||||
| 4-Jun | Barbara | 4-Jun | 462, take 4 drawer filing cabinet to faculty support room | ||||
| 4-Jun | JRH | 4-Jun | Take down school flag and ship back for repairs | ||||
| 4-Jun | JRH | 6-Jun | South entrance, clean waxy material on planter cap stones | ||||
| 4-Jun | Dave | 4-Jun | key stuck in panic bar, east entrance | ||||
| 5-Jun | JRH | 5-Jun | 201H, tighten all cabinet pull handles | ||||
| 5-Jun | JRH | 5-Jun | 409, clear attic door way of chairs | ||||
| 5-Jun | JRH | 9-Jun | cove base dents: 408,406,405,403,454 | ||||
| 5-Jun | JRH | 5-Jun | Atrium south, 2 cfm lamps out | ||||
| 5-Jun | JRH | 5-Jun | Atrium south, extra table from room 403 | ||||
| 5-Jun | JRH | 5-Jun | Atrium north 1 cf lamp (or more) | ||||
| 5-Jun | JRH | 5-Jun | 454, remove extra chairs | ||||
| 6-Jun | JRH | 6-Jun | Heritage area, water plants | ||||
| 6-Jun | JRH | 6-Jun | Men's faucets, lower pressure | ||||
| 6-Jun | JRH | 6-Jun | Broken tree, west end, south, saw off | ||||
| 6-Jun | JRH | 6-Jun | 201H, spay sinks at end of day | ||||
| 9-Jun | JRH | 10-Jun | 401, entrance door, recess strike plate on door edge | ||||
| 9-Jun | JRH | 9-Jun | fire door, 4th floor center | ||||
| 9-Jun | JRH | 9-Jun | plants, lobby, water | ||||
| 9-Jun | JRH | 9-Jun | Gnats, add drain-o | ||||
| 9-Jun | JRH | 9-Jun | tower basin, sweep | ||||
| 9-Jun | Teal | 10-Jun | 3rd floor ladies, increase water pressure | ||||
| 9-Jun | JRH | 9-Jun | AHU 4-1, replace outside and return filters | ||||
| 9-Jun | JRH | 9-Jun | AHU 4-2, replace outside and return filters | ||||
| 10-Jun | Teal | 10-Jun | 304, replace lamp | ||||
| 10-Jun | JRH | 10-Jun | School flag, raise | ||||
| 10-Jun | JRH | 10-Jun | men's' water pressure, raise a little | ||||
| 11-Jun | JRH | 11-Jun | tower, sweep | ||||
| 11-Jun | JRH | 11-Jun | 112, adjust door to close easier | ||||
| 11-Jun | JRH | 11-Jun | Fountain, add chlorine, sweep | ||||
| 12-Jun | JRH | 13-Jun | Fountain, clean filter, vacuum | ||||
| 11-Jun | Anthony | 20-Jun | Install counter , released for work on 6/20 | ||||
| 11-Jun | JRH | 11-Jun | 201H, spay sinks at end of day | ||||
| 11-Jun | JRH | 11-Jun | door, south lobby, west end squeaks | ||||
| 11-Jun | Dave | 11-Jun | 2nd floor ceiling tiles, reset | ||||
| 12-Jun | Barbara | 16-Jun | 368, clock is off | ||||
| 12-Jun | Rehbein | 12-Jun | west stairwell Chartwells poster | ||||
| 12-Jun | Rehbein | 13-Jun | letter U on the brick sign driving east | ||||
| 12-Jun | JRH | 12-Jun | Door closes slow, east end, south side, west door | ||||
| 12-Jun | JRH | 12-Jun | Check mouse traps on west end | ||||
| 13-Jun | Dawn | 13-Jun | 313, setup registration table, chair | ||||
| 13-Jun | JRH | 13-Jun | 354, remove malfunctioning smoke detector | ||||
| 13-Jun | Jaimie | 13-Jun | lobby, set up tables and chairs | ||||
| 13-Jun | JRH | 13-Jun | 201H, spay sinks at end of day | ||||
| 13-Jun | Dawn | 13-Jun | Atrium, set up for Saturday | ||||
| 16-Jun | JRH | 16-Jun | 2nd floor E. secure ceiling tile | ||||
| 16-Jun | JRH | 17-Feb | 211, cove base tucked in, SE corner | ||||
| 16-Jun | JRH | 16-Jun | 220, secure corner guard | ||||
| 16-Jun | JRH | 16-Jun | 2nd floor, E. latrines, remove tape from outlet | ||||
| 16-Jun | JRH | 16-Jun | door, north, center, inside closes too hard | ||||
| 16-Jun | JRH | 16-Jun | door, north,east,south, too soft | ||||
| 16-Jun | JRH | 16-Jun | door, north, east set, too soft | ||||
| 16-Jun | JRH | 16-Jun | door, north, center left, too soft | ||||
| 16-Jun | JRH | 16-Jun | door north, west, set too soft | ||||
| 16-Jun | Yanti | 25-Jun | 361, missing trash can | ||||
| 16-Jun | Dawn | 16-Jun | Atrium, set up two tables | ||||
| 16-Jun | Tracy | 16-Jun | 201, deliver 2 drawer file cabinet | ||||
| 16-Jun | Dawn | 17-Jun | 256, set up for 90 people | ||||
| 16-Jun | JRH | 16-Jun | CUB, run pump to get 220 ORP | ||||
| 17-Jun | 17-Jun | 464J, re-hang picture | |||||
| 17-Jun | Yanti | 17-Jun | 304A is warm | ||||
| 17-Jun | Dawn | 17-Jun | 252, take 20 chairs to back of room | ||||
| 17-Jun | JRH | 17-Jun | Fountain, vacuum west pool | ||||
| 17-Jun | JRH | 23-Jun | Boiler, track the temperature and pressure through one cycle. | ||||
| 17-Jun | Tracy | 17-Jun | 201, take several boxes for storage | ||||
| 18-May | Dawn | 19-Jun | 351, one table and a chair | ||||
| 18-Jun | Tracy | 19-Jun | lobby 3 tables, 4 chairs | ||||
| 18-Jun | JRH | 19-Jun | Clock 3, set to run 30 minutes earlier | ||||
| 18-Jun | JRH | 19-Jun | Clocks 1, 2, set the correct time | ||||
| 18-Jun | JRH | 19-Mar | 265D, match paint repair | ||||
| 18-Jun | JRH | 19-Mar | Check mouse traps on west end | ||||
| 18-Jun | JRH | 18-Mar | Heritage area, water plants | ||||
| 19-Jun | Yanti | 19-Jun | 304A, is still warm, opened vent, recommended move "backup" "heater" | ||||
| 19-Jun | JRH | 19-Jun | Restroom lights, check and replace as required | ||||
| 19-Jun | JRH | 19-Jun | Fountain, clean filter | ||||
| 19-Jun | JRH | 19-Jun | 265J, put bug box behind door | ||||
| 18-Jun | Dawn | 19-Jun | 264, assemble shelves | ||||
| 19-Jun | Barbara | 19-Jun | Move file cabinets 464-H to 462, 464-K to 464-H, 464-Q to 464-K | ||||
| 20-Jun | JRH | 20-Jun | Irrigation, set clocks to run every other day | ||||
| 20-Jun | JRH | 20-Jun | Irrigation, check for dry spots, adjust as required | ||||
| 20-Jun | Lupita | 20-Jun | CUB, Post boiler certificate | ||||
| 20-Jun | JRH | 23-Jun | 464S, trim carpet strings | ||||
| 20-Jun | Dawn | 20-Jun | 256, set up file cabinet and 5 tables | ||||
| 20-Jun | JRH | 20-Jun | Fire alarm battery- UB1280, 12v 8 amp universal battery | ||||
| 20-Jun | Dave | 20-Jun | Fire alarm test. Alarm was seen at UPD | ||||
| 23-Jun | Dawn | 23-Jun | 453, setup a table in front of room | ||||
| 23-Jun | Tracy | 23-Jun | 201, move cabinet to below new fax machine | ||||
| 23-Jun | JRH | 23-Jun | Tower, determine why motorized valves don't open | ||||
| 23-Jun | JRH | 23-Jun | 420, check air flow | ||||
| 23-Jun | JRH | 23-Jun | Tower, backwash filter | ||||
| 23-Jun | JRH | 23-Jun | 255, lower excess wire bundle for counter power supply | ||||
| 23-Jun | JRH | 23-Jun | Tower filter, backwash | ||||
| 24-Jun | JRH | 24-Jun | Fountain, brush, shock, vacuum | ||||
| 24-Jun | JRH | 24-Jun | Entrance pipe outfall, cement rocks to prevent erosion | ||||
| 24-Jun | Lupita | 3-Jul | Install 4 parking signs west of the building( waiting on parts) | ||||
| 24-Jun | JRH | 8-Jul | Boiler # 1 circulating pump isn't, motor ordered | ||||
| 24-Jun | JRH | 25-Jun | Boiler expansion tank, verify operation, bladder on order | ||||
| 24-Jun | Lupita | 24-Jun | 401J, boll wevals in cabinets. Removed oatmeal, killed 95% | ||||
| 24-Jun | Tracy | 24-Jun | 201, assemble sorter | ||||
| 25-Jun | JRH | 27-Jun | Tower, sweep | ||||
| 25-Jun | JRH | 25-Jun | AHU 4-2, clean cold coils | ||||
| 25-Jun | JRH | 25-Jun | Condenser water #2, clean filter, (was dirty) | ||||
| 25-Jun | JRH | 25-Jun | Chiller pressure guages, clean and shut off | ||||
| 25-Jun | JRH | 25-Jun | Tree stakes, remove 2 from west end | ||||
| 26-Jun | JRH | 27-Jun | Condenser water pump #1, clean filter | ||||
| 26-Jun | JRH | 26-Jun | Condenser water pump #3, clean filter | ||||
| 26-Jun | JRH | 26-Jun | 309, change out clock battery | ||||
| 26-Jun | JRH | 26-Jun | 357, carpet string | ||||
| 26-Jun | JRH | 26-Jun | Fountain, vacuum | ||||
| 26-Jun | JRH | 26-Jun | Inspect irrigation zones 1-48, 2-12, 2-14 | ||||
| 26-Jun | JRH | 27-Jun | 362, Dent in cove base | ||||
| 26-Jun | JRH | 27-Jun | 358, dent in cove base | ||||
| 26-Jun | JRH | 27-Jun | west landing, 3rd floor, 2 t-8s, 1 cf | ||||
| 26-Jun | JRH | 27-Jun | north lobby, 1 cf out | ||||
| 27-Jun | JRH | 27-Jun | 2nd floor lobby, 6 lamps out | ||||
| 27-Jun | JRH | 27-Jun | Eye wash, change water, add additive | ||||
| 27-Jun | JRH | 27-Jun | Install combo guage on condenser pump # 1 | ||||
| 27-Jun | JRH | 27-Jun | 351, touch up corner | ||||
| 30-Jun | jrh | 30-Jun | 3rd floor mens', replace ballast | ||||
| 30-Jun | jrh | 30-Jun | CUB, Condenser pump # 1 clean filter, (nothing) | ||||
| 30-Jun | jrh | 30-Jun | CUB, Condenser pump # 2 clean filter, (nothing) | ||||
| 30-Jun | jrh | 30-Jun | CUB, Condenser pump # 2, add liquid gasket to filter flange (no help) | ||||
| 30-Jun | jrh | 30-Jun | CUB, Turn off automatic air vent on condenser water (may help) | ||||
| 30-Jun | jrh | 30-Jun | CUB, Condenser pump # 1, clean out line for guage | ||||
| 30-Jun | jrh | 1-Jul | CUB, Condenser pump # 3, clean out line for guage | ||||
| 30-Jun | jrh | 1-Jul | CUB, Condenser lines at chillers, clean out guage ports | ||||