Initiated Requestor Completed Description Comments
1-May JRH 2-May 414, remove dents in cove base
1-May JRH 2-May 413, remove dents in cove base
1-May JRH 2-May 404, remove cove base dent in east wall
1-May JRH 2-May 405, remove cove base dent in east wall
1-May JRH 2-May 401, remove cove base dents
1-May JRH 1-May 4th floor hall light out
1-May JRH 2-May 413, 5 chair screws on white board tray, install
1-May JRH 5-May 420 Hall, touch up two spots
1-May Barbara 1-May 404, set up in horseshoe
1-May JRH 5-May 405, touch up patches, fill dent east wall
1-May JRH 5-May Back Faculty entrance, touch up corners
2-May Jaimie 2-May Popcorn machine, take to 404 and return to 254
2-May JRH 2-May 454, remove cove base dents
2-May JRH 2-May 453, remove cove base dents
2-May JRH 2-May 455, remove cove base dent
5-May JRH 5-May 401J, match paint on previous touchups
5-May JRH 15-May 401, door screw head on south door rubs north door
5-May Jaimie 5-May Popcorn machine, clean out
5-May JRH 5-May CUB, Acid line, repair small leak
5-May Barbara 5-May 404 set up normal
6-May JRH 6-May Fountain, vacuum, sweep, add chlorine
6-May JRH 6-May Lobby light
6-May JRH 6-May Entrance, 2 tree lights
6-May Alice 6-May 2 chairs for ACC book buy back
6-May JRH 6-May Atrium lights, two replaced
6-May JRH 7-May Fountain filter pump, low suction
7-May Dawn 7-May Atrium 4 tables
7-May Jim 8-May 256, setup
7-May JRH 9-May light ballast in entrance
8-May 8-May 464, move boxes to cage
8-May Jill 9-May 401H, light out
9-May JRH 9-May US Flag replace for repair
9-May Dave 9-May West Parking lot timer failed. Replaced battery
9-May Tracy 9-May 201H, lamp out
9-May JRH 12-May Organize shop
12-May Dawn 12-May Move 3 tables to elevator lobby
12-May King 12-May 354, rearrange furniture
12-May JRH 12-May Fountain, vacuum, sweep, add chlorine
12-May JRH 13-May Excessive water use, boiler relief valve turned on
12-May Lou 15-May 304, add soap dispenser
12-May JRH 12-May 304C, bleed off air from CRAC unit to reduce cycling
13-May JRH 12-May CUB, Acid line, repair small leak
13-May JRH 13-May Boiler leak, tighten coupling.
14-May JRH 28-May Boiler # 1, Pressure relief valve leaks, valve on order
14-May JRH 12-May Tower pressure gauges, check and clean
14-May JRH 13-May Add 5 gallons of TRAC 107 to boiler system
14-May JRH 14-May Replace acid feed pump
14-May Dawn 14-May 256, 252 set up
15-May Vincent 15-May 112, secure door closure
15-May JRH 19-May Windmill, determine diameter, 10 feet
15-May JRH 15-May Trail, return washed out granite to trail
15-May JRH 15-May East path, repair from washout, add sides
19-May JRH 19-May light out near elevator
19-May JRH 19-May Light out near 464C
19-May JRH 19-May CUB, move air vent line to return to main acid tank
19-May Vincent 19-May 364, Change projector to grounded circuit from nearby wall
19-May JRH 22-May Elevator # 3. Doors don't shut on 4th floor. Tejas called.
20-May JRH 20-May Post out of order signs on Elevator # 3
20-May JRH 20-May Drainage, open up path for storm water at old Seaton crossing
20-May JRH 21-May Drainage, adjust overflow from south campus at trail sidewalk 
20-May JRH 22-May Generator, charger volts high, display going out. Charger on order
20-May JRH 20-May 111, 4' foot tube out
20-May JRH 20-May 101, 2 lights out
20-May JRH 20-May 119, clean up fire sprinkler drips
20-May JRH 21-May Hall outside of 111. Patch and paint nail ding
20-May Barbara 20-May Move desks for Barbara's new location
21-May Dawn 20-May 256,252 set up
21-May Barbara 21-May Move night stand for printer
21-May JRH 23-May 201, repair wall dings, outside of 201D
21-May JRH 22-May 204, pull dent out of cove base
21-May JRH 22-May 204, reset ceiling tile
21-May JRH 21-May 210, pull dent out of cove base
21-May JRH 21-May 221, pull dent out of cove base
21-May JRH 21-May door, south inside #1 from right squeaks
21-May JRH 22-May door, north, inside, # 4, 6 from left rub
21-May JRH 23-May 256, replace two missing lamps (blown fuse)
21-May JRH 21-May 258, pull dent out of cove base
21-May JRH 22-May hallway outside of 257, reset tile
21-May JRH 22-May west entrance, reset ceiling tile
22-May JRH 22-May 256, replce 2 4' lamps
22-May JRH 22-May Remove outdated recycle signs in restrooms
22-May JRH 22-May Tower # 1, clean hot section
22-May Lupita 22-May Install out of order signs on elevator # 3
23-May JRH 23-May Fountain, vacuum, sweep, add chlorine
23-May Barbara 23-May Ice maker, Faculty, clean coils
23-May JRH 23-May Trail, fill in washout at east corner parking lot by drop inlet
23-May JRH 23-May Trail, mound up the dirt just north of spillway, west side
26-May JRH 26-May Blowdown flow is slow
26-May JRH 26-May 3rd floor west end, reset ceiling tile
26-May JRH 26-May Tower, blowdown filter
26-May JRH 26-May 265H, adjust door clouser
26-May JRH 26-May 261, replace hallway light
26-May JRH 26-May 1st floor stair light, replace
26-May JRH 26-May west end, reset ceiling tiles
26-May JRH 30-May Check for MSD sheets for all cleaning chemicals
26-May JRH 29-May 3rd floor east end, 4' lamp out
26-May JRH 29-May 307, label Master thermostat
26-May JRH 30-May 300, adjust leg on wobbly table
26-May JRH 29-May 301, Remove tape on carpet seam, glue down carpet as required
26-May JRH 30-May 304, Cut strings from carpet seam
26-May JRH 30-May 304, glue down carpet seam behind Teal.
26-May JRH 30-May West end, 3rd floor, reset ceiling tile
26-May JRH 30-May Elevator # 2, light out
26-May JRH 29-May 314, replace lamps
26-May JRH 29-May 463, replace lamps
28-May Tracy 29-May 406, remove tables
28-May Alice 28-May 256, set up for book sale
28-Apr Lupita 28-May 401, adjust door to latch
29-May Tracy 29-May 252, 3c,2t in front of elevators